
NAV Series TCP/IP Standalone Network Access Controller
6
2 Installation
The Installation has three procedures described as below. Each procedure will be
introducedinthefollowingsectionsindetail.
2.1 Installation Preparation
Before installation, users are advised to collect information properly which will make the
installation more smoothly and helps to reduce time and energy cost. For professional
constructors,theinformationbelowwillbeofgreatuse.
2.1.1 Obtain a Floor Plan
Obtain a floor plan of the building in which the access control system is to be installed.
Obtainingafloorplanhelpstheinstallerdeterminewhatcomponentsneedtobeinstalled,
Chapter
2
tep1:InstallationPreparation
Obtainafloorplan
Determinethehardwareandlocation
Determine the number of controllers according to
systemstructure
tep2:HardwareInstallation
Installingthecontroller
Connectingtothedoorlock/openbutton/sensor/bell
Connectingtothealarminput/output
Connectingtothecardreader
Connecting to the computer through the networkMount a
backupbatteryintheenclosure
tep3:
oftwareSetup/Configuration
Logincontrollerbuilt‐insoftwarethroughIEoncomputer
Setuseraccoun tforusersoftware
Setcontrollerandotherequipment
Setholidays,shiftsanddoorAccessRule
Logincardandsetcardattributes
Comentarios a estos manuales